Wheels/Tires: 18-inch KMC Nemesis on 215/35R18 Yokohoma Parada Spec II rubber

Suspension/Chassis: 3/8-inch 2500 Firestone airbags in the front; 2600 in the rear / custom trailing arms with Panhard bar in the rear / 1/2-inch air line and valves / scuba tanks for air supply

Body Modifications: '02 Ford Ranger front end / 3-1/2-inch stock-floor body drop / shaved antenna, door handles, gas door, wiper cowl, firewall, and emblems / smoothed bed floor with custom 3-D flames out of metal / custom diamond-plate inserts

Interior: Metal dash and center console with diamond-plate inserts / billet cup holders / BAD steering wheel

Future Plans: 302ci motor / 18-/20-inch rim combo / shave tailgate / suicide passenger door

Project Completion Date: Never

Wheels/Tires: 16-inch chrome Nissan Frontier rollers on Kumho 205/40R16 rubber

Suspension/Chassis: AIM 3-inch dropped lower control arms / 2,500-pound Slam Specialties airbags / four-link / 15-gallon fuel cell / 9-gallon air tank / PlayStation controller / dual compressors / all suspension modifications by Extreme Customs in Jones, Alabama

Body Modifications: 3-inch body drop / Hardbody 4x4 front fenders in front and grafted onto bed / suicide doors and hood / hood cut for engine clearance / '95 Toyota chrome bumper and valance / shaved door handles, cowl vents, door handles, taillights, third brake light, rear cab vents, gas door, tailgate, and hood squirters / full skin combo from FBI with Supra taillights / flush-mounted 14-inch LED for third brake light / smoothed bed floor / Nissan logo grafted to the front of the hood / all work by Extreme Customs in Jones, Alabama / tonneau cover from Street Beat

Interior/Stereo: Doors covered with raised flames / MTX 4360 amplifier powering three MTX 5000 component sets

Engine/Performance: FBI Intake / Pace Setter header and muffler / electric fan

Future Plans: Finish it

Special Thanks: Bubba / Chris / Extreme Images Car Club / FBI / AIM / friends and family for putting up with the long hours - there are still plenty more hours to come

Project Completion Date: ????